Wednesday, December 19, 2007
Thursday, December 6, 2007
Crete
We have concrete!
We missed documenting a few steps along the way including: the rest of the pilings, the under slab plumbing, two inspections and the forming of the concrete- not to mention the 12 more loads of dirt we had to put on the ground to make our desired 11' elevation.
We poured the slab today at high noon and the boys finished slicking it about 6pm.
Next step: framing.
Subscribe to:
Posts (Atom)