Plumbing is complete. HVAC is 99% complete and electric is almost there. After we complete the rough in for everything, we will need the framers to come back and fur out some walls and ceilings to hide a few pipes/ducts/wires/etc. After that, we're on to insulation and drywall!
Above are just a few more shots of the interior- to the left is a bedroom, complete with sliding glass door out to a front porch and to the right is the third floor loft area, overlooking the living room.